Overview on Building NOC
Every individual who plans to undertake new construction, erect, re-erect, make alterations to any part of a building, or demolish any building must obtain building permits from the local planning authority. Building permission serves as the No Objection Certificate (NOC) for building construction. The application for a Construction NOC can be made through a registered architect or a licensed engineer/structural engineer to the planning authority.
A NOC is a legal document issued by an authority, institution, or even an individual, certifying that no legal issues will arise from the intended action or business. A Building NOC clarifies that there are no legal impediments that could affect the construction or renovation activities.
Advantages of Building NOC
The advantages of obtaining a Building NOC are:
- Ensures the protection of individuals living in the building.
- Helps avoid higher penalties and imprisonment.
- Protects the owner from legal formalities and potential losses.
- Grants the right to construct a building legally.
- Serves as a pre-requisite for obtaining other licenses and NOCs.
The NOC acts as proof that the relevant authority has no objection, allowing the individual to proceed with the construction of the building.
Documents Required for Obtaining a Building NOC
To apply for a Building NOC, you must submit the following documents:
-
Copy of Building Plans through the Building Authority, including:
- Site plan
- Building plan
- Layout plan
- Analysis report
The building plan must comply with the prescribed bye-laws.
-
Completed checklist in a questionnaire format.
-
ID and address proof of the applicant.
-
Images of the establishment/building taken from the outside.
-
Blueprint of the building.
-
Layout certified by the architect.
-
Building security certificate.
Procedure to Obtain Building NOC
The procedure for obtaining a Building NOC involves several important steps, ensuring compliance with various approvals required before construction. Here's the stepwise guide:
Step 1
Procure all the required documents.
Step 2
Submit an online application with pre-DCR (Development Control Regulations) drawings to get pre-approval. Various approvals required before starting the construction include:
-
Land Title
Ensure the land has a clear title, confirming the property’s legal standing and condition. The builder must acquire the land before starting the project. -
Land Clearance
Obtain consent from relevant authorities regarding the conversion of agricultural land to non-agricultural land. Approval is needed from the local body and the Ministry of Urban Development (UD). -
Zonal Clearance
After securing land titles and land clearance, obtain a permit from the zonal authorities for approval as per local government regulations. -
Building Approval and Building Plan
Approval is needed from authorities based on the building byelaws, master plan, and local body act. The building plan outlines the building’s layout and ensures compliance with building codes. -
Layout Approval
Builders must secure approval for the design plan from relevant professionals before construction begins. -
Imitation of Disapproval
This refers to the criteria that must be followed at different stages of the construction process, divided into three categories:- Before construction begins
- During construction
- After construction is completed
-
Completion Certificate
After completing construction, the builder must obtain a Completion Certificate before selling the property. This ensures that the building follows the approved plan. -
Installation of Services and Utilities
The builder must obtain permission for utilities, ensuring that the building complies with the relevant building codes. -
Occupancy Certificate
This certificate is required from the local body before anyone occupies the building. The local body issues a recommendation after inspections and NOC approval.
Step 3
Submit the file offline.
Step 4
A site visit report is prepared, and the Building Inspector issues an order.
Step 5
Make payments for fees and challans.
Step 6
Final stamp approval on the blueprint.
Step 7
Obtain the Commencement Certificate, allowing construction to officially begin.
What Penalties are Imposed in Case of Non-Compliance in Obtaining a Building NOC?
It means there is no specification given in terms of amount (Penalty) and imprisonment. However, non-compliance can result in higher penalties depending on the authority and place of the building.
Fastzeal Procedure for Building NOC
To obtain a Building NOC legally and securely, you can follow the steps outlined below, ensuring the smooth functioning of your real estate business. Fastzeal experts will guide you through the process and assist you with compliance requirements, ensuring a seamless experience.
Here’s how Fastzeal can help you:
Step 1: Purchase a Plan for Expert Assistance
Choose a plan that suits your needs for expert support and begin the process.
Step 2: Add Queries Regarding Building NOC
Submit any queries or questions you may have regarding the Building NOC process. Our experts will provide the answers and clarify doubts.
Step 3: Provide Documents to Fastzeal Expert
Submit all the necessary documents required for the application process. Fastzeal experts will verify your documentation to ensure it’s complete.
Step 4: Prepare Application for Building NOC + Complete All Admissibility Criteria for Preliminary Screening
Once the documents are provided, Fastzeal will prepare your application for Building NOC and ensure it meets all admissibility criteria for the preliminary screening.
Step 5: Complete Procedural Actions
Fastzeal will manage all procedural actions required to ensure that your application is compliant with all regulatory requirements.
Step 6: Receive Building NOC at Your Doorstep
Once the process is completed, Fastzeal will deliver the Building NOC directly to you.
Why Choose Fastzeal?
-
Real Estate Expertise
We recommend appointing an attorney with real estate experience to help navigate potential pitfalls and ensure all requirements are met. -
Seamless Legal Assistance
Fastzeal coordinates with professionals to fulfill all your legal and financial requirements. Our clients consistently rate us highly for our legal services and simplifying complex processes. -
Transparency and Tracking
Our clients can track the progress of their application on our platform at any time. If you have any questions, our experienced representatives are always available for assistance.
Let Fastzeal handle your Building NOC needs and help you grow your construction business efficiently and legally.
Frequently Asked Questions:
A Building NOC serves as a legal document confirming that the competent authority has no objection to the construction of a building.
Building NOC is permission granted by the appropriate government authority to proceed with the construction or purchase of a property. An applicant must obtain this No Objection Certificate (NOC) from the relevant authorities before starting construction.
To obtain a Land NOC, an applicant needs to visit the individual Circle Office and apply for the NOC application form. The application must be properly filled out and signed by both the seller(s) and purchaser(s), along with the required documents.
No, an NOC from the builder is not required if the land title is clear and marketable. However, an NOC is necessary for selling the flat.
Yes, to ensure safety, the relevant authority requires a Fire NOC for businesses to confirm that fire safety measures are in place. This is mandatory for almost every business entity.
If the builder fails to provide the Occupancy Certificate, the buyer can take legal action. Buyers may also withhold payment or refuse to accept possession if the certificate is not provided.
No, selling a property without a valid Occupancy Certificate is illegal. The property is considered unauthorized, and it is also a requirement for applying for a home loan.
The local authority provides the Completion Certificate after inspecting the premises to ensure compliance with the approved building plan.
A Completion Certificate should be provided within 8 weeks after the building work is completed, provided it meets all regulations.